What are the special requirements of the plasma generator for the cooling water of the process
- Categories:Company Dynamics
- Author:Plasma cleaning machine-CRF plasma plasma equipment-plasma surface treatment machine manufacturer-chengfeng intelligent manufacturing
- Origin:
- Time of issue:2021-08-25
- Views:
(Summary description)What are the special requirements of the plasma generator for the cooling water of the process: Process cooling water is a commonly used temperature control medium in industrial production. It has a wide range of applications. Its application in plasma generators belongs to the cooling of process equipment. In fact, processed products are sensitive to temperature. Large plasma generators will generate a lot of heat when they work. Dry vacuum pumps will generate high temperatures after friction when they work. This is why we equip the equipment with process cooling water. What are the requirements and precautions for plasma generators that use process cooling water? Let's take a look. 1. Water source of process cooling water: There are two main sources of process cooling water used in the plasma generator, the cooling water supply source and the terminal circulating water supply. For large equipment, it is recommended to install a chiller separately to facilitate subsequent maintenance. 2. General requirements for the cooling water of the technological process: The cooling water temperature of the plasma generator should generally be controlled at 20~50°C, which can be adjusted according to actual needs; the pressure is generally 0.3~0.5MPa, and the flow rate is generally 2~7SLM. According to actual usage requirements, actual parameters need to be determined. 3. Real-time monitoring and control of process cooling water. All the parts that need to be cooled are key components. If the temperature is too high or the pressure is insufficient, the product will be scrapped and the equipment parts will be damaged. Therefore, real-time monitoring is very important. Once the requirements are exceeded, the production must be stopped immediately. Generally, the monitoring of the pressure and flow of cooling water is completed by a water flow switch. The water flow switch is divided into mechanical and quantitative types, which need to be used in series on the water inlet pipe. When the pressure or flow is too small, the signal is output to realize the alarm function of the device. Under normal circumstances, an independent water flow switch is installed at the entrance of each temperature control component to ensure stability and reliability. The method to realize the temperature alarm is to install the temperature sensor to each component, the chiller signal output, and each component has its own temperature sensor signal output. The specific implementation method is selected according to actual needs. In practice, in order to ensure the stability of equipment operation, multiple methods are often used at the same time. The above is the plasma generator's requirements for process cooling water and precautions for use. If you have any questions, please click on the online customer service of Chengfeng Zhizao for consultation, and Chengfeng Zhizao is waiting for your call!
What are the special requirements of the plasma generator for the cooling water of the process
(Summary description)What are the special requirements of the plasma generator for the cooling water of the process:
Process cooling water is a commonly used temperature control medium in industrial production. It has a wide range of applications. Its application in plasma generators belongs to the cooling of process equipment.
In fact, processed products are sensitive to temperature. Large plasma generators will generate a lot of heat when they work. Dry vacuum pumps will generate high temperatures after friction when they work. This is why we equip the equipment with process cooling water. What are the requirements and precautions for plasma generators that use process cooling water? Let's take a look.
1. Water source of process cooling water:
There are two main sources of process cooling water used in the plasma generator, the cooling water supply source and the terminal circulating water supply. For large equipment, it is recommended to install a chiller separately to facilitate subsequent maintenance.
2. General requirements for the cooling water of the technological process:
The cooling water temperature of the plasma generator should generally be controlled at 20~50°C, which can be adjusted according to actual needs; the pressure is generally 0.3~0.5MPa, and the flow rate is generally 2~7SLM. According to actual usage requirements, actual parameters need to be determined.
3. Real-time monitoring and control of process cooling water.
All the parts that need to be cooled are key components. If the temperature is too high or the pressure is insufficient, the product will be scrapped and the equipment parts will be damaged. Therefore, real-time monitoring is very important. Once the requirements are exceeded, the production must be stopped immediately.
Generally, the monitoring of the pressure and flow of cooling water is completed by a water flow switch. The water flow switch is divided into mechanical and quantitative types, which need to be used in series on the water inlet pipe. When the pressure or flow is too small, the signal is output to realize the alarm function of the device. Under normal circumstances, an independent water flow switch is installed at the entrance of each temperature control component to ensure stability and reliability.
The method to realize the temperature alarm is to install the temperature sensor to each component, the chiller signal output, and each component has its own temperature sensor signal output. The specific implementation method is selected according to actual needs. In practice, in order to ensure the stability of equipment operation, multiple methods are often used at the same time.
The above is the plasma generator's requirements for process cooling water and precautions for use. If you have any questions, please click on the online customer service of Chengfeng Zhizao for consultation, and Chengfeng Zhizao is waiting for your call!
- Categories:Company Dynamics
- Author:Plasma cleaning machine-CRF plasma plasma equipment-plasma surface treatment machine manufacturer-chengfeng intelligent manufacturing
- Origin:
- Time of issue:2021-08-25 20:30
- Views:
What are the special requirements of the plasma generator for the cooling water of the process:
Process cooling water is a commonly used temperature control medium in industrial production. It has a wide range of applications. Its application in plasma generators belongs to the cooling of process equipment.
In fact, processed products are sensitive to temperature. Large plasma generators will generate a lot of heat when they work. Dry vacuum pumps will generate high temperatures after friction when they work. This is why we equip the equipment with process cooling water. What are the requirements and precautions for plasma generators that use process cooling water? Let's take a look.
1. Water source of process cooling water:
There are two main sources of process cooling water used in the plasma generator, the cooling water supply source and the terminal circulating water supply. For large equipment, it is recommended to install a chiller separately to facilitate subsequent maintenance.
2. General requirements for the cooling water of the technological process:
The cooling water temperature of the plasma generator should generally be controlled at 20~50°C, which can be adjusted according to actual needs; the pressure is generally 0.3~0.5MPa, and the flow rate is generally 2~7SLM. According to actual usage requirements, actual parameters need to be determined.
3. Real-time monitoring and control of process cooling water.
All the parts that need to be cooled are key components. If the temperature is too high or the pressure is insufficient, the product will be scrapped and the equipment parts will be damaged. Therefore, real-time monitoring is very important. Once the requirements are exceeded, the production must be stopped immediately.
Generally, the monitoring of the pressure and flow of cooling water is completed by a water flow switch. The water flow switch is divided into mechanical and quantitative types, which need to be used in series on the water inlet pipe. When the pressure or flow is too small, the signal is output to realize the alarm function of the device. Under normal circumstances, an independent water flow switch is installed at the entrance of each temperature control component to ensure stability and reliability.
The method to realize the temperature alarm is to install the temperature sensor to each component, the chiller signal output, and each component has its own temperature sensor signal output. The specific implementation method is selected according to actual needs. In practice, in order to ensure the stability of equipment operation, multiple methods are often used at the same time.
The above is the plasma generator's requirements for process cooling water and precautions for use. If you have any questions, please click on the online customer service of Chengfeng Zhizao for consultation, and Chengfeng Zhizao is waiting for your call!